We look forward toworking with you.
Feel free to reach out for any queries. We would be happy to help!
The XE250U tracked hydraulic excavator is a 25ton class excavator from XCMG, it is designed for complex working conditions such as earthmoving,road construction, mining, municipal engineering etc. This excavator adopts a highly efficient and energy-saving power system and advanced hydraulic control technology, provide powerful digging capabilities, precise handling, and excellent fuel economy. It can meet the needs of long-term, high-load continuous operation, making it a high-efficiency choice among 25-ton class tracked excavators.
+
-
Features and Advantages:
1. Powerful power system:Equipped with a high-performance engine and an advanced hydraulic system, this excavator achieves rapid response and stable output, easily handling high-intensity working conditions such as earthwork excavation, mining operations, and infrastructure construction.
2. High-efficiency hydraulic system : By adopting advanced hydraulic control technology, the boom, stick, and bucket movements are smoothly coordinated, making excavation, loading, and rotation more efficient, effectively shortening the operation cycle and improving overall construction efficiency.
3. Excellent excavation performance :With powerful digging, lifting and operating range, it can be widely used in earthwork engineering, quarrying, road construction, municipal construction, river management and other fields.
4. Energy saving and environmental protection:The engine and hydraulic system can be precisely matched, and combined with intelligent power control technology, the power output can be automatically adjusted according to the actual working conditions, effectively reducing fuel consumption while ensuring efficient operation and helping customers reduce long-term operating costs.
5. Comfortable and intelligent driving environment:The spacious cab is equipped with a suspended seat, automatic air conditioning, and a large LCD screen, which effectively reduces noise and vibration and improves comfort during long-term operation.
6. Easy maintenance:The excavator's engine layout is reasonable, and the filters, radiator, and other components are easy to inspect and maintain, facilitating quick and easy maintenance, reducing maintenance time, increasing equipment uptime, and making XCMG parts readily available in the market.
The XCMG XE250U excavator is widely used for:
Earthwork Engineering
·Building and Construction Foundations
· Road Construction
·Municipal Engineering
·Water Conservancy Engineering
·Mining

01
The high-performance engine effectively enhances heavy-duty work capabilities. With a rated power of 150 kW and a total weight of approximately 25.5 tons, the engine provides continuous and stable power output, easily handling heavy construction tasks such as large-scale earthwork projects, mining, and infrastructure construction.
02
The high-performance engine effectively enhances heavy-duty work capabilities. With a rated power of 150 kW and a total weight of approximately 25.5 tons, the engine provides continuous and stable power output, easily handling heavy construction tasks such as large-scale earthwork projects, mining, and infrastructure construction.
03
With a large working range, a maximum digging radius of approximately 10,240 mm, and a maximum unloading height of approximately 6,980 mm, this machine has an operating radius exceeding 10 meters and a maximum unloading height approaching 7 meters. This allows it to cover a larger construction area, reduce frequent equipment movement, and improve loading efficiency and overall construction progress. It is adaptable to a wider range of working scenarios.
04
Energy saving effectively reduces overall operating costs. The fuel tank capacity is approximately 400 liters. Precise matching of the engine and hydraulic system enables efficient and low-fuel-consumption operation. The large 400-liter fuel tank supports long-term continuous construction, and the maximum travel speed of 5.5 km/h allows for rapid on-site relocation, effectively increasing equipment uptime and reducing overall operating costs. Compared to other brands of the same tonnage, it has significant advantages.
| Sales model | XE250U | |
| Operating weight | 25700 | |
| Bucket capacity | 1.2 | |
| Engine | Model | QSB6.7 |
| Direct injection | √ | |
| Four strokes | √ | |
| Water cooling | √ | |
| Turbo-charging | √ | |
| No. of cylinders | 6 | |
| Rated power | 142/2000 | |
| Maximum torque/speed | 803/1500 | |
| Displacement | 6.7 | |
Main performance | Travel speed | 6.0/4.1 |
| Swing speed | 11.6 | |
| Gradeability | ≤35 | |
| Ground pressure | 56.7 | |
| Bucket digging force | 176 | |
| Arm digging force | 125 | |
| Maximum tractive force | 188.6 | |
| Hydraulic system | Rated flow of main pump | 2×260 |
| Main safety valve pressure | 34.3/37 | |
| Travel system pressure | 34.3 | |
| Swing system pressure | 25 | |
| Pilot system pressure | 3.9 | |
Oil Capacity | Fuel tank capacity | 400 |
| Hydraulic tank capacity | 256 | |
| Engine oil capacity | 24 | |
Appearance size | Overall length | 10220 |
| Overall width | 3390 | |
| Overall height | 3180 | |
| Width of platform | 2830 | |
| Track length | 4640 | |
| Overall width of chassis | 3390 | |
| Track width | 800 | |
| Wheel base of crawler | 3842 | |
| Track gauge | 2590 | |
| Counterweight clearance | 1050 | |
| Min. ground clearance | 485 | |
| Min. tail swing radius | 2985 | |
| Track height | 810 | |
Working scope | Max. digging height | 9595 |
| Max. dumping height | 6745 | |
| Max. digging depth | 6960 | |
| Maximum depth cut for 2240mm(8 ft) level bottom | 6750 | |
| Max. vertical wall digging depth | 5545 | |
| Max. digging radius | 10240 | |
| Min. swing radius | 3510 | |
Standard | Length of boom | 6000 |
| Length of arm | 2964 | |
| Bucket capacity | 1.2 | |
Optional | Length of boom | / |
| Length of arm | / | |
| Bucket capacity | / | |
FAQ:
Q1: Can the XE250U be equipped with different attachments?
A: Yes,different attachments can be selected according to actual work needs, such as different types of buckets, rock buckets, hydraulic breakers etc. Specific configurations need to be confirmed based on the machine model and actual working conditions.
Q2: Can you arrange shipment from China?
A: Yes,we can assist in arranging the export of the excavator from China and provide a suitable shipping solution based on the destination port and other details.
Q3: What is the warranty period for the XE250U?
A: The specific warranty period varies depending on the purchase contract,normally 6 months.
Q4: How long is the delivery time?
A: Delivery time mainly depends on inventory, machine configuration, order quantity, and shipping arrangements. A new machinery normally need about 30-45 working days.
Products Center
We look forward toworking with you.
Feel free to reach out for any queries. We would be happy to help!
Service and Support
Previous